MTC 3.1 Explained for Dished Head Buyers | Dingjin

Nov 18, 2026

Leave a message

What Is a Mill Test Certificate 3.1? A Guide for Dished Head Buyers

Stainless Steel Dished Heads

A mill test certificate 3.1, written EN 10204 Type 3.1, is the material document that reports actual test results for the batch you received, signed by an inspection representative who does not report to production. It is the working document for pressure-retaining parts in Europe. On a head order it is also the document most often misread, because it certifies the plate. It does not certify the head.

Contact now

 

 

Four document types, and the number that matters

EN 10204:2004 defines four inspection documents. The differences are who tested, on what material, and who signed.

Type

What it states

Test data source

Signed by

2.1

Declaration that the product meets the order

None; no values reported

Manufacturer

2.2

Declaration plus test results

Routine production, not necessarily your batch

Manufacturer

3.1

Declaration plus specific test results

The heat or batch supplied to you

Manufacturer inspection representative, independent of production

3.2

Same as 3.1, independently verified

The batch supplied, witnessed

Manufacturer representative plus independent third party

The gap between 2.2 and 3.1 is not paperwork. A 2.2 can carry values from a different heat than the one in your crate. A 3.1 carries the heat you received. For a pressure boundary, that difference is the whole point.

Ten fields to check on the certificate

Field

What to look for

1. Document type and standard

The line reads EN 10204:2004 / 3.1, not just certificate of quality

2. Manufacturer name and address

The mill, not the trading company that forwarded the file

3. Order reference

Your PO number, so the document links to your transaction

4. Product description

Standard, grade, dimensions and quantity, matching the order

5. Heat number

The identifier that must also appear on the physical material

6. Chemical composition

Measured values for each specified element, not the words within specification

7. Mechanical properties

Yield, tensile, elongation; impact and hardness where the order requires them

8. Heat treatment condition

Process and parameters, for example solution annealed at a stated temperature

9. Test standards and editions

Which test method, and which edition of it

10. Signature, name, title, date

An inspection or QA signatory, not a production manager

A certificate missing any of these is not incomplete in a cosmetic way. It is incomplete in the way an auditor will notice.

The part buyers miss: a 3.1 covers the plate, not the head

A head starts as a plate and stops being one after forming. Hot forming at roughly 900 to 950 degrees Celsius, normalizing at 870 to 930, stress relief at 595 to 650: these are typical ranges for carbon steel, and each step rewrites the microstructure that the plate certificate describes.

ASME Section VIII Division 1 addresses this directly. Under UCS-85(c), when plate is used in the normalized plus stress-relieved condition, the test coupon has to see the complete fabrication heat treatment, including every heating and cooling cycle above 480 degrees Celsius. A coupon that saw normalizing only does not represent the head, and the results it gives are not conservative.

So the document pack for a formed head is not one certificate. It is a set:

The plate certificate, EN 10204 3.1 or the ASME material test report, traceable to the heat number.

A heat treatment record covering forming, normalizing and post-weld heat treatment, with temperatures and holding times.

Test results from the simulated coupon, where the code or the purchase order requires them.

A dimensional report that includes minimum thickness after forming.

NDT reports for the methods specified on the drawing.

For stainless heads, add solution annealing records and positive material identification. The plate certificate will not tell you what happened at the knuckle, and the knuckle is where the wall is thinnest.

Why certificates get rejected at goods-in

What goes wrong

What it looks like

What to do

Heat number does not match

The paper says one heat, the marking says another

Hold the material; do not release it to fabrication

2.2 supplied against a 3.1 order

Values exist but trace to routine production

Return or re-test at the supplier cost

Signed by production

Name and title belong to the shop, not to QA

Reject; a 3.1 needs an independent inspection signatory

No measured chemistry

The composition block repeats the specification limits

Request a reissue with actual values

Heat treatment not described

One word, normalized, and no temperature or hold time

Request the treatment record

Standard edition missing

No year, so the limits cannot be checked

Ask which edition governs the order

The heat number is the one to check first. ASME SA-20 clause 13.1 requires plate marking to carry the heat number, the grade, the plate identifier and the manufacturer mark. If the certificate and the marking disagree, nothing else on the page is worth reading until that is resolved.

3.1 or 3.2: decide before the order, not after

For equipment under the Pressure Equipment Directive, Annex I point 4.3 sets the floor: main pressure-bearing parts of Category II, III and IV equipment need a certificate of specific product control. Which certificate satisfies that floor depends on the conformity assessment module. Quality assurance routes such as D, D1, E and E1 generally accept 3.1. Product verification and unit verification, modules F and G, bring an independent body in to witness and countersign.

A 3.2 costs money and calendar time. An inspector has to attend, witness the tests and co-sign the certificate, and that has to be scheduled. On a large vessel project it is a line item. On a single tank it can add weeks to the documentation. Specify it when the module, the client or the end user requires it, and name the acceptable inspection bodies so the quotes you receive are comparable.

Under ASME, the material test report to Section II is the document of record, and an EN 10204 3.1 format is commonly accepted alongside it. The code stamp belongs to the vessel. The head still needs its own traceability, and that traceability starts at the heat number.

Write it into the purchase order

A purchase order that says mill certificate will receive whatever the supplier has on file. The requirement has to be specific enough to price and to inspect. This wording is enough:

Material certificate: inspection certificate EN 10204:2004 Type 3.1, issued by the
material manufacturer, signed by an authorized inspection representative independent
of the production department. Heat number to be marked on each head and to appear on
the certificate. Heat treatment record to state forming temperature, normalizing
temperature and post-weld heat treatment temperature, with holding times.

Where a third party is required, add one line: countersigned by the purchaser inspection representative or by a named independent body, with tests witnessed. Where impact or hardness results are needed on the head rather than on the plate, say so, because those tests are not on the mill certificate by default.

Two details cause avoidable back and forth later. Language: if the certificate will be read by a notified body or an end user in a specific country, say which language is required, because a correct certificate in the wrong language still stops an audit. Format: a scan is normally accepted, but the heat number has to be legible both on the certificate and in the marking photograph supplied with it. A document that cannot be tied to the physical part is not traceability.

Dished heads and material documentation at Dalian Dingjin

We form elliptical, torispherical and hemispherical heads in carbon steel and stainless steel, from two production bases and one R&D center in Dalian, and have supplied pressure vessel closures for more than 24 years. Our plant holds a third-class pressure vessel manufacturing license and fabricates to ASME and other cited codes. Each batch of plate is checked for chemical composition, mechanical properties and surface quality before it enters production, and since 2014 we have shipped an average of more than 1,000 tons of dish heads a year.

Send the material specification, the certificate type and the inspection list with your inquiry, and our engineers will confirm the forming route and the documents that will be issued, then quote within 24 hours.

FAQ

Q: Is an MTC the same as an MTR?

A: They are two names for the same document. MTC stands for mill test certificate, MTR for material test report. EN 10204 Type 3.1 is a specific format with batch test data and an independent inspection signatory. Asking for a mill certificate without naming the type leaves the format open.

Q: Why did the supplier send a 2.2 when the order asked for 3.1?

A: Usually one of two reasons. The supplier is a trader passing on a document that was never batch-specific, or the requirement was written as mill certificate and never reached the mill as a 3.1 instruction. Both are fixed by naming the type in the purchase order.

Q: Does a dished head need 3.1 or 3.2?

A: For most pressure equipment under PED, 3.1 is the working level. A 3.2 comes in where the conformity assessment module, the client specification or an authority requires third-party witnessing. Confirm the module before ordering, because 3.2 changes both cost and lead time.

Q: The heat number on the certificate does not match the marking. What now?

A: Hold the material. Do not release it to fabrication until the mismatch is resolved, either by a corrected certificate or by re-identification. A document that does not match the physical part provides no traceability, and the cost of resolving it later is higher than the cost of resolving it at goods-in.

Q: Are new mechanical tests needed after forming?

A: Where the code or the order requires simulated heat treatment coupons, yes, and the coupon has to follow the full fabrication cycle. Where it does not, the heat treatment record together with the dimensional and NDT reports documents what happened to the plate. State the requirement in the order so it is clear which route applies.

Send your material specification and certificate requirement today, and our engineers will confirm the forming route, the heat treatment and the document pack, then send a quotation within 24 hours.